Riverdale Road Bridge

This project included the reconstruction and widening of approximately one mile of Riverdale Road from I-84 to 1900 West, including two blocks of 1900 West in Roy and Riverdale Utah. The bridge over I-15 was completely replaced and the Hill Field Railroad Bridge Deck was replaced. The old asphalt pavement was replaced with concrete pavement and the drainage and utility infrastructure was upgraded. The I-15 ramps were rebuilt and reconfigured to allow left turns onto Riverdale Road exiting I-15, and left turns onto I-15 from eastbound Riverdale Road. A major challenge on this project was maintaining traffic through Riverdale and Roy during construction and allowing access to businesses along this corridor.

Client

UDOT

Completion Date

March 2016

LOCATION

Davis County, UT