Completed Projects

VIEW BY TYPE
bangeter_redwood

Bangerter Highway – Redwood

The $32 Million Bangerter/Redwood Interchange project included a grade-separated single point urban interchange (SPUI) with a 350′ three span bridge to carry Bangerter Highway’s traffic over Redwood Road. The 125’ wide bridge consisted of 30 steel girders, 750,000 lbs. of […]

West Apron Tunnel

West Apron Tunnel

Constructing a massive 846-foot-long tunnel across the West Apron of the Salt Lake International Airport required a lot more from our firm than just innovative thinking and long hours in the trenches.
The tunnel required more than 150,000 cubic yards of […]

Valley View Bridge

Valley View Bridge

Significant flooding wracked the St. George area in 2004 and wiped out one of the area’s oldest federally funded bridges. The city temporarily replaced the bridge with precast box culverts, but the replacement couldn’t to handle the volatile desert flooding. […]

Utah State Capitol

Utah State Capitol

Few projects garner the deserved attention of the historic Utah State Capitol Restoration.  Originally constructed in 1915, the 320,000 square foot Utah State Capitol needed to undergo a complete restoration and renovation in order to ensure public safety in the […]

Union Heights Parking Garage

Union Heights Parking Garage

Union Heights Parking Garage is a 700-stall, post-tensioned concrete parking garage that was built with a ‘long-span’ design that offers great cost-efficiency, as well as a very open feeling and client friendly design.
The most significant material innovation on this project […]

St. George Boulevard Interchange

St. George Boulevard Interchange

The $16.3 million project included upgrading the Interstate 15 interchange at Utah Exit 8 to a Diverging Diamond Interchange (DDI), structure rehabilitation, and inclusion of a pedestrian facility. The European design has the lanes narrow and cross over the bridge […]

airport

SLC Airport Deicing Pad 34R

The Deicing Pad Construction Project associated with runway 34R was an integral part of the ongoing Salt Lake City International Airport Expansion.  Completion of this project by Wadsworth Brothers Construction added a vital lifeline to Airport Operations by providing a […]

Slate Creek Bridge

Slate Creek Bridge

The new Slate Creek Bridge spans the beautiful and pristine Salmon River in central Idaho. Construction of the bridge started in spring 2010 with the purpose of replacing the older bridge, which no longer met highway safety standards. The project […]

Riverdale Road Bridge

Riverdale Road Bridge

This project included the reconstruction and widening of approximately one mile of Riverdale Road from I-84 to 1900 West, including two blocks of 1900 West in Roy and Riverdale Utah. The bridge over I-15 was completely replaced and the Hill […]

Parley's Canyon

Parley’s Canyon

Wadsworth Brothers Construction replaced four bridges on 1-80 in Parley’s Canyon, east of Salt Lake City, in two weekends in mid-August 2008.   The extensive process was completed in just 37 hours.   “It’s the fastest bridge replacement I’ve ever […]

Colorado Bridge, Moab

Colorado Bridge Moab

The only road into Moab, Utah crosses the Colorado River just east of town. The bridge spanning the river at that point required replacement in the late 2000s, and with as little environmental impact as possible. The Colorado Bridge project […]

Millrock Business Park

Millrock Business Park

Millrock West is a 468-stall parking structure nestled near the mouth of Big Cottonwood Canyon.   Challenges included beginning the project in December 2005, the heart of the winter season.   Despite inclement weather and less than ideal conditions, the […]

SR-77 Springville

I-15 SR-77 Springville

The goal of this project was to replace the interchange at Utah State Route 77, I-15 and SR-147. The interchange needed reconstruction over a span of 2 miles, and was part of the Utah Department of Transportation’s (UDOT) design-build project.
Working […]

George S. Eccles 2002 Legacy Bridge

George Eccles 2002 Legacy Bridge

In the Spring of 2001, the University of Utah awarded a contract to Wadsworth Brothers Construction for the construction of a new pedestrian bridge designed to carry foot traffic from the Olympic Village to Fort Douglas to the Special Events […]

Bluff Street

I-15 Bluff Street

One of Southern Utah’s more challenging highway projects of recent years, the new I-15 Bluff Street junction promised to relieve traffic backups at both the junction and in adjacent intersections. The Utah Department of Transportation (UDOT) designed the project with […]

Heavy Highway

Heavy Highway

Wadsworth Brothers Construction Company is a recognized leader in bridge and highway construction in the State of Utah. WBC began as a bridge contractor in 1991 and has evolved into a multifaceted construction company with three different divisions, over 200 […]

Hoback Bridge

Hoback Junction Bridge

The Wyoming Transportation Commission has congratulated Wadsworth Brothers Construction for the successful completion of the $25 million Hoback Junction Arch Bridge over the Snake River just south of Jackson, Wyoming.
The 780-foot-long steel girder bridge on U.S. 26-89 southwest of Hoback […]

9-Finished-Bridge

Colorado River Bridge

Wadsworth Brothers completed the construction of a $38.5 million concrete segment bridge over the Colorado River in Moab, Utah. This is the first concrete segmental bridge to be constructed in Utah and utilizes a unique form traveler system called Bridge […]